"...They have been a great company to work with and I would recommend them to anyone for anything — from basic service to major upgrades..."

Dave Kuchta - The Jackson Laboratory
Read the complete testimonial


 
Our Preventive Maintenance Agreement (PMA) covers all manufacturers’ sterilizers and related equipment. The sterilizer to be covered by the agreement is first surveyed by an ETC Field Service Engineer. If discrepancies in the sterilizer are discovered, a cost estimate is provided to bring the equipment up to proper operating standards prior to the initiation of a PMA. Once deficiencies have been corrected, a PMA can begin. The PMA cost is then based upon the engineer’s survey and on the type or equipment, location/access, and number or inspections to be conducted per year.

Once the PMA contract becomes effective, the sterilizer is then inspected routinely to prevent downtime and assure optimum performance. The inspections are scheduled to not interfere with normal operations. Sterilizer parts covered under the PMA include:

  • Doors
  • Relief valves
  • Process piping systems
  • Control systems